Approximately 1.9 miles of Galloway Road from Stafford to Conway will be widened and repaved.
Crew has been inspecting all culverts and drains within the right of way to determine if they need replaced. If needed, pipes have been replaced or relocated for construction purposes.
Construction will begin with milling the existing asphalt, which will be used along with additional materials for the base of the new pavement.
While road is under construction, crews will repair and widen shoulders within the right of way.
New pavement will be installed.
Striping will be completed at the end of the summer.
Chip seal operations will begin on June 25, 2025 and continue throughout the following two weeks.